Routings: Operation Times, Labour Rates and Setup Spread over the Batch
This lesson is part of the course
In this lesson
You turn a routing into minutes and labour cost per bench, spread each setup over the batch size and see how much a small batch costs per unit.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- The Single-Level BOM: Quantity × Unit Cost = Material per Unit Locked
- Multi-Level BOMs: Parents, Children and Extended Quantities Locked
- Scrap Factors and Yield: From Net to Gross Quantities Locked
- Routings: Operation Times, Labour Rates and Setup Spread over the Batch Locked
- Overhead Rates: Machine Hours, Labour Hours and Applied Overhead Locked
- The Cost Roll-Up: Parts into Assemblies, Assemblies into the Product Locked
- Price-Change Impact: Where-Used Lists, New Costs and Margins Locked
- Make or Buy a Sub-Assembly, and the Cost Structure Chart Locked