Moisture Shrink: From Wet Tonnes to Paid Dry Tonnes
This lesson is part of the course
In this lesson
You apply a fictional buyer contract to eight loads: water shrink above the contract's base moisture with MAX, a handling shrink on every load, the paid tonnes, the overall shrink and the value of the weight lost.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Harvest Capacity: Hectares per Hour and Days in the Field Locked
- Yield Checks: Test Strips, Field Averages and Spread Locked
- Moisture Shrink: From Wet Tonnes to Paid Dry Tonnes Locked
- Drying Costs: Water Removed, Energy and Cost per Tonne Locked
- Bin Volumes: Cylinders, Cones and Tonnes per Bin Locked
- Carts and Trucks: Keeping the Combine Running Locked
- Store or Sell: Carry Costs, Interest and Break-Even Price Locked
- Capstone: Harvest Dashboard and Sales Plan Locked