Batch Planning: Overage, Grams per Product, Number of Batches and Even Batch Sizes
This lesson is part of the course
In this lesson
You add an overage for cup residue to every line, total the grams per product, split them into as few batches as the fictional cup limit allows and size the batches evenly.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Mould Volumes: Boxes, Cylinders, Shaped Moulds by Water Test and a Full Set Locked
- Volume to Mass: Fictional Densities, Grams per Piece and Pieces per Kit Locked
- Mix Ratios: Parts A and B by Weight and by Volume, and Checking a Weighed Mix Locked
- Batch Planning: Overage, Grams per Product, Number of Batches and Even Batch Sizes Locked
- Pour Layers: Number of Pours, Even Layers and a Pour-and-Demould Schedule Locked
- Pigments and Inclusions: Displaced Volume, Adjusted Resin Need and Pigment Grams Locked
- Waste and Yield: Mixed vs Used, Waste % per Project, Overall Waste and Savings from Batching Locked
- Cost per Piece and Pricing: Resin, Extras, Moulds Spread over Casts, Hours and a Price Chart Locked