Capex, Installation Costs & Grants (Capped, Eligible Items Only)
This lesson is part of the course
In this lesson
You build the Eastgate hub budget from line items, add up the grant-eligible part with SUMIFS, apply a capped grant with MIN and get the net capex with a contingency.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Sessions, kWh & Utilisation per Charger (Hours Occupied) Locked
- Charging Time by Power Level & Vehicle (Simplified Taper) Locked
- Electricity Cost: Energy Charges + Demand Charges on the Peak kW Locked
- Pricing Models: per kWh, per Minute & Idle Fees, and the Gross Margin Locked
- Site Sizing: Chargers Needed for a Demand Profile (Peak Hour, with Chart) Locked
- Capex, Installation Costs & Grants (Capped, Eligible Items Only) Locked
- Payback & NPV per Site: 10-Year Cash Flow (with Chart) Locked
- Utilisation Scenarios & Break-even Utilisation Locked