Machine Hour Rate: Depreciation, Energy, Labour and Overhead → Conversion Cost
This lesson is part of the course
In this lesson
You build the hourly rate of a fictional 120 t machine from depreciation, maintenance, floor space, energy and a shared operator, add the overhead surcharge and turn the rate into the conversion cost per good part of the lid.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Part & Shot Weight: Volume, Density, Cavities and the Runner Locked
- Material Cost per Good Part: Resin Price, Masterbatch, Regrind and Scrap Locked
- Cavities & Output: Parts per Hour, per Shift and Days to Fill an Order Locked
- Cycle Time Build-Up: Injection, Holding, Cooling and Mould Moves Locked
- Machine Size: Projected Area, Clamp Force and the Machine Class Locked
- Machine Hour Rate: Depreciation, Energy, Labour and Overhead → Conversion Cost Locked
- Tooling: Tool Price by Cavities, Amortisation and the Break-Even Volume Locked
- The Quote: Part Price at 5k, 50k and 500k Pieces, Margin and a Chart Locked