A 52-Week Simulation: Arrivals After the Lead Time, Net Stock and the Pipeline
This lesson is part of the course
In this lesson
You complete a 52-week (R,S) simulation: look up the order that arrives after the lead time, update the net stock, place the order that brings the position back to S, and chart the on-hand path.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Three Ways to Reorder: Continuous (s,Q), Periodic (R,S) and Min–Max (s,S) Locked
- The Order-Up-To Level: Demand Over R + L Plus Safety Stock Locked
- Choosing the Review Period: Ordering Cost Against Holding Cost Locked
- Inventory Position: On Hand + On Order − Backorders, and the Order at Each Review Locked
- A 52-Week Simulation: Arrivals After the Lead Time, Net Stock and the Pipeline Locked
- Service Measures: Stock-Out Weeks, Fill Rate and Average Stock Locked
- Tuning Min–Max: Cost Versus Service for Six (s,S) Settings Locked
- Joint Replenishment: One Supplier, a Common Review Day and a Minimum Order Value Locked