Shunter Moves: Workload Minutes, Shunters per Shift and the Cost of the Yard Fleet
This lesson is part of the course
In this lesson
You turn the planned trailer moves of each shift into workload minutes, size the number of shunters per shift with a productive share, find the weighted average minutes per move and cost the shunter fleet for a day.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- The Gate Log: Arrivals, Departures and Trailers on Site at Any Time Locked
- Dwell Time: Hours on Site, Ageing Buckets and Averages by Status Locked
- Yard Capacity: Slots by Zone, Peak Occupancy, Utilisation and Overflow Risk Locked
- Shunter Moves: Workload Minutes, Shunters per Shift and the Cost of the Yard Fleet Locked
- Gate Throughput: Check-In Minutes, Lanes at Peak and the Planning Wait Locked
- Drop-Trailer Pools: Turn Times, Pool Size, Tractors and the Cost of Extra Trailers Locked
- Free Time and Charges: Hours Held, Chargeable Days and Charges by Carrier Locked
- The Yard Audit and the KPI Chart: System vs Physical Check, Accuracy and Unknown Trailers Locked