Tutorvo

Shunter Moves: Workload Minutes, Shunters per Shift and the Cost of the Yard Fleet

Lesson 4 of 815 minLab

This lesson is part of the course

In this lesson

You turn the planned trailer moves of each shift into workload minutes, size the number of shunters per shift with a productive share, find the weighted average minutes per move and cost the shunter fleet for a day.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. The Gate Log: Arrivals, Departures and Trailers on Site at Any TimeLab15 min Locked
  2. Dwell Time: Hours on Site, Ageing Buckets and Averages by StatusLab15 min Locked
  3. Yard Capacity: Slots by Zone, Peak Occupancy, Utilisation and Overflow RiskLab14 min Locked
  4. Shunter Moves: Workload Minutes, Shunters per Shift and the Cost of the Yard FleetLab15 min Locked
  5. Gate Throughput: Check-In Minutes, Lanes at Peak and the Planning WaitLab15 min Locked
  6. Drop-Trailer Pools: Turn Times, Pool Size, Tractors and the Cost of Extra TrailersLab16 min Locked
  7. Free Time and Charges: Hours Held, Chargeable Days and Charges by CarrierLab16 min Locked
  8. The Yard Audit and the KPI Chart: System vs Physical Check, Accuracy and Unknown TrailersLab18 min Locked