Recovery & Net Smelter Return (NSR) per Tonne of Ore
This lesson is part of the course
In this lesson
You follow copper and gold from the ore through the flotation plant to the smelter and calculate the net smelter return per tonne of four ore types.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Tonnage & Contained Metal: Volume, Density, g/t, % and Ounces Locked
- Grade-Tonnage Curve: Tonnes & Average Grade above Cut-off (with Chart) Locked
- Break-even Cut-off Grade: Cost ÷ (Price × Recovery × Payable) Locked
- Strip Ratio, Mining Cost per Tonne of Ore & the Break-even Strip Ratio Locked
- Recovery & Net Smelter Return (NSR) per Tonne of Ore Locked
- Annual Production Schedule & Mine Life (with Chart) Locked
- Mine Cash Flow, NPV & IRR: Capex, Sustaining Capex & Royalties Locked
- AISC per Ounce & Sensitivity to the Gold Price Locked