Plating Jobs: Parts per Rack, Rack Current, Plating Time and Metal Used
This lesson is part of the course
In this lesson
You fill a job sheet for three fictional rack jobs: how many racks each order needs, the current per rack, the plating time per rack and the metal deposited on the whole order.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Charge: Q = I × t, Coulombs vs Ampere-Hours and the Faraday Constant Locked
- Faraday's First Law: From Charge to Moles and Grams of Deposited Metal Locked
- Plating Thickness: Mass ÷ (Density × Area), Micrometres and µm per Hour Locked
- Current Efficiency: Actual vs Theoretical Mass and the Time for a Target Thickness Locked
- Plating Jobs: Parts per Rack, Rack Current, Plating Time and Metal Used Locked
- Cell Potentials: Standard Reduction Potentials, E_cell = E_cathode − E_anode and Spontaneity Locked
- The Nernst Equation: Concentration Effects, Concentration Cells and Temperature Locked
- Battery Capacity: Ampere-Hours, Coulombs and Moles of Active Material Locked