Surface Preparation: Condition Ratings, Prep Rates by Lookup and Prep Hours
This lesson is part of the course
In this lesson
You rate every surface of the fictional flat, look up a prep rate for its condition with XLOOKUP, turn minutes per m² into prep hours, add the filler patches and see how much of the prep time the poor surfaces eat.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- The Takeoff: Wall and Ceiling Areas minus Openings, Skirting Metres and Totals Locked
- Surface Preparation: Condition Ratings, Prep Rates by Lookup and Prep Hours Locked
- Production Rates: m² per Hour by Surface and Method, Painting Hours per Room Locked
- Materials: Litres from Coats and Coverage, Whole Cans with CEILING and Sundries Locked
- Crew Days and Job Duration: Hours to Working Days, Drying Gaps and Finish Dates (WORKDAY) Locked
- Pricing the Job: Labour, Materials, Overhead per Day, Margin vs Markup and Price per m² Locked
- Job Costing: Quoted vs Actual Hours and Materials, Variances and Profit per Job Locked
- Capstone: The Business Dashboard – Win Rate, Average Job, Profit per Crew Day and a Chart Locked