Tutorvo

Simple LCOE of a Wind Farm with the Capital Recovery Factor

Lesson 8 of 814 minLab

This lesson is part of the course

In this lesson

You turn the farm's investment into an equal annual payment with the capital recovery factor, add the operating cost and divide by the net AEP to get the levelised cost of energy in USD per MWh.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Power in the Wind: Air Density, Swept Area & ½ρAv³Lab15 min Locked
  2. Betz Limit, Power Coefficient Cp & Rotor SizingLab15 min Locked
  3. Wind Shear: Power-Law Exponent & Hub-Height ExtrapolationLab15 min Locked
  4. Power Curve Lookup with Linear InterpolationLab17 min Locked
  5. Weibull Wind Distribution: Mean Speed, Bin Probabilities & HoursLab17 min Locked
  6. Annual Energy Production: Σ Hours × Power (with Chart)Lab15 min Locked
  7. Losses, Net AEP & Capacity Factor of a Wind FarmLab14 min Locked
  8. Simple LCOE of a Wind Farm with the Capital Recovery FactorLab14 min Locked