PUE & DCiE: How Much Energy Reaches the IT?
This lesson is part of the course
In this lesson
You calculate the monthly PUE and DCiE of Kestrel DC-1 from the utility and PDU meters, find the correct six-month PUE and chart how the summer cooling load pushes PUE up.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- IT Load to Annual Energy: kW, kWh & Load Factor Locked
- PUE & DCiE: How Much Energy Reaches the IT? Locked
- Power Capacity per Rack & Stranded Capacity Locked
- Cooling Load: kW, BTU/h & Tons of Refrigeration Locked
- UPS Redundancy: N, N+1, 2N & Installed Capacity Locked
- Energy Cost & Savings from a Better PUE Locked
- Carbon: Location-Based, Market-Based & CUE Locked
- GPU & AI Racks: Density Growth vs Power Capacity Locked