Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m²
This lesson is part of the course
In this lesson
You look up the fictional screws per board for walls, second layers and ceilings, add a spare allowance, turn the total into whole boxes and work out what the fixings cost per square metre lined.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Takeoffs: Net Wall and Ceiling Areas, Openings and a Room Schedule by Floor (SUMIFS) Locked
- Boards and Waste: Sheets per Wall by Layout and by Area, Waste Allowance and Joint Metres Locked
- Studs and Tracks: Studs at Fixed Spacing, Extra Studs at Doors, Track Metres and Stock Lengths Locked
- Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m² Locked
- Taping and Jointing: Coats by Finish Level, Tape Metres and Compound Bags from a Label Rate Locked
- Plastering: Material from Area × Thickness × Coverage, Bags per Surface and Pooled Orders Locked
- Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAY Locked
- The Quote: Cost Lines, Overhead, Price at a Target Margin, Markup vs Margin and a Cost Chart Locked