Tutorvo

Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m²

Lesson 4 of 814 minLab

This lesson is part of the course

In this lesson

You look up the fictional screws per board for walls, second layers and ceilings, add a spare allowance, turn the total into whole boxes and work out what the fixings cost per square metre lined.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Takeoffs: Net Wall and Ceiling Areas, Openings and a Room Schedule by Floor (SUMIFS)Lab15 min Locked
  2. Boards and Waste: Sheets per Wall by Layout and by Area, Waste Allowance and Joint MetresLab16 min Locked
  3. Studs and Tracks: Studs at Fixed Spacing, Extra Studs at Doors, Track Metres and Stock LengthsLab15 min Locked
  4. Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m²Lab14 min Locked
  5. Taping and Jointing: Coats by Finish Level, Tape Metres and Compound Bags from a Label RateLab15 min Locked
  6. Plastering: Material from Area × Thickness × Coverage, Bags per Surface and Pooled OrdersLab15 min Locked
  7. Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAYLab17 min Locked
  8. The Quote: Cost Lines, Overhead, Price at a Target Margin, Markup vs Margin and a Cost ChartLab16 min Locked