Tutorvo

Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAY

Lesson 7 of 817 minLab

This lesson is part of the course

In this lesson

You turn quantities and fictional production rates into whole crew days per stage, chain the stages with drying waits into start and finish dates with WORKDAY and price the crew time.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Takeoffs: Net Wall and Ceiling Areas, Openings and a Room Schedule by Floor (SUMIFS)Lab15 min Locked
  2. Boards and Waste: Sheets per Wall by Layout and by Area, Waste Allowance and Joint MetresLab16 min Locked
  3. Studs and Tracks: Studs at Fixed Spacing, Extra Studs at Doors, Track Metres and Stock LengthsLab15 min Locked
  4. Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m²Lab14 min Locked
  5. Taping and Jointing: Coats by Finish Level, Tape Metres and Compound Bags from a Label RateLab15 min Locked
  6. Plastering: Material from Area × Thickness × Coverage, Bags per Surface and Pooled OrdersLab15 min Locked
  7. Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAYLab17 min Locked
  8. The Quote: Cost Lines, Overhead, Price at a Target Margin, Markup vs Margin and a Cost ChartLab16 min Locked