Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAY
This lesson is part of the course
In this lesson
You turn quantities and fictional production rates into whole crew days per stage, chain the stages with drying waits into start and finish dates with WORKDAY and price the crew time.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Takeoffs: Net Wall and Ceiling Areas, Openings and a Room Schedule by Floor (SUMIFS) Locked
- Boards and Waste: Sheets per Wall by Layout and by Area, Waste Allowance and Joint Metres Locked
- Studs and Tracks: Studs at Fixed Spacing, Extra Studs at Doors, Track Metres and Stock Lengths Locked
- Fixings: Screws per Board by Lookup, Spare Allowance, Whole Boxes and Fixing Cost per m² Locked
- Taping and Jointing: Coats by Finish Level, Tape Metres and Compound Bags from a Label Rate Locked
- Plastering: Material from Area × Thickness × Coverage, Bags per Surface and Pooled Orders Locked
- Labour: Production Rates, Crew Days, Drying Waits and Stage Dates with WORKDAY Locked
- The Quote: Cost Lines, Overhead, Price at a Target Margin, Markup vs Margin and a Cost Chart Locked