Dock Door Scheduling: Door-Minutes, Doors Needed and the Peak
This lesson is part of the course
In this lesson
You turn the truck schedule into door-minutes per two-hour block, size the doors needed with ROUNDUP, find the peak and measure how busy the dock is over the day.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Pick Rates: Lines and Units per Hour against a Labour Standard Locked
- Labour Planning: Hours and Staff per Shift from the Order Forecast Locked
- ABC Slotting by Pick Frequency and the Pareto Chart Locked
- Travel Distance Savings from Slotting: Metres, Hours and Dollars Locked
- Space Utilisation: Pallet Position Occupancy and Cube Utilisation Locked
- Dock Door Scheduling: Door-Minutes, Doors Needed and the Peak Locked
- Order Accuracy and the Perfect Order Rate Locked
- Cost per Order and per Unit with Activity-Based Costing Locked