Pick Rates: Lines and Units per Hour against a Labour Standard
This lesson is part of the course
In this lesson
You turn one shift's picking log into lines and units per hour, compare every picker with the engineered labour standard, pool the team's rate correctly and count who is below the performance floor.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Pick Rates: Lines and Units per Hour against a Labour Standard Locked
- Labour Planning: Hours and Staff per Shift from the Order Forecast Locked
- ABC Slotting by Pick Frequency and the Pareto Chart Locked
- Travel Distance Savings from Slotting: Metres, Hours and Dollars Locked
- Space Utilisation: Pallet Position Occupancy and Cube Utilisation Locked
- Dock Door Scheduling: Door-Minutes, Doors Needed and the Peak Locked
- Order Accuracy and the Perfect Order Rate Locked
- Cost per Order and per Unit with Activity-Based Costing Locked