Tutorvo

Pick Rates: Lines and Units per Hour against a Labour Standard

Lesson 1 of 813 minLab

This lesson is part of the course

In this lesson

You turn one shift's picking log into lines and units per hour, compare every picker with the engineered labour standard, pool the team's rate correctly and count who is below the performance floor.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Pick Rates: Lines and Units per Hour against a Labour StandardLab13 min Locked
  2. Labour Planning: Hours and Staff per Shift from the Order ForecastLab15 min Locked
  3. ABC Slotting by Pick Frequency and the Pareto ChartLab15 min Locked
  4. Travel Distance Savings from Slotting: Metres, Hours and DollarsLab14 min Locked
  5. Space Utilisation: Pallet Position Occupancy and Cube UtilisationLab14 min Locked
  6. Dock Door Scheduling: Door-Minutes, Doors Needed and the PeakLab14 min Locked
  7. Order Accuracy and the Perfect Order RateLab14 min Locked
  8. Cost per Order and per Unit with Activity-Based CostingLab16 min Locked