Strip Footings, Pads & Round Piers
This lesson is part of the course
In this lesson
You take off strip footings and square pads as boxes and round piers as cylinders with PI, total the volume, see how much sits in the piers and turn the volume into tonnes for the crane and the trucks.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- Slab Volumes: Area × Thickness, Waste & the Order Step Locked
- Strip Footings, Pads & Round Piers Locked
- Ready-Mix Trucks vs Bagged Concrete: Loads, Short-Load Fees & Bag Counts Locked
- Rebar Grids: Bar Counts, Laps & Weight to Order Locked
- Formwork: Formed Edges, Form Area, Stakes & Release Agent Locked
- Block Walls: Net Area, Blocks per m², Order Count & Core Grout Locked
- Brick Facades & Mortar: Bricks per m², Mix Ratios, Cement Bags & Sand Locked
- The Pour Quote: Labour from Productivity, Overhead, Markup & a Cost Chart Locked