Tutorvo

Ready-Mix Trucks vs Bagged Concrete: Loads, Short-Load Fees & Bag Counts

Lesson 3 of 816 minLab

This lesson is part of the course

In this lesson

You count truck loads with ROUNDUP, find the size of the last load and charge a short-load fee when it is too small, count bags from the bag yield and decide pour by pour whether the truck or the bags are cheaper.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Slab Volumes: Area × Thickness, Waste & the Order StepLab14 min Locked
  2. Strip Footings, Pads & Round PiersLab15 min Locked
  3. Ready-Mix Trucks vs Bagged Concrete: Loads, Short-Load Fees & Bag CountsLab16 min Locked
  4. Rebar Grids: Bar Counts, Laps & Weight to OrderLab16 min Locked
  5. Formwork: Formed Edges, Form Area, Stakes & Release AgentLab15 min Locked
  6. Block Walls: Net Area, Blocks per m², Order Count & Core GroutLab15 min Locked
  7. Brick Facades & Mortar: Bricks per m², Mix Ratios, Cement Bags & SandLab16 min Locked
  8. The Pour Quote: Labour from Productivity, Overhead, Markup & a Cost ChartLab18 min Locked