Tutorvo

Pontoon and Dredging Reserves: Replacement Schedules, Dredging Cycles and Contributions with PMT

Lesson 7 of 817 minLab

This lesson is part of the course

In this lesson

You date the next replacement of each pontoon and the next dredging, inflate today's costs to the year they fall due, compute the yearly reserve contribution with PMT and turn the total into a surcharge per berth-metre.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. Berth Inventory: Length Bands, Rates per Metre and Potential RevenueLab15 min Locked
  2. Annual, Seasonal and Visitor Nights: Season Rates, Occupancy and Revenue per Berth-MetreLab16 min Locked
  3. The Waiting List: Berth Fit, the Smallest Fitting Berth and Revenue Lost to OversizingLab16 min Locked
  4. Fuel Dock and Chandlery: Margin per Litre, Price Changes and the Shop Attach RateLab15 min Locked
  5. Haul-Outs and Winter Storage: Lift Bookings, Hard-Standing Space and the Haul-Out ScheduleLab16 min Locked
  6. Yard Work Quotes: Labour Hours, Antifouling Area from the Label and Materials MarkupLab16 min Locked
  7. Pontoon and Dredging Reserves: Replacement Schedules, Dredging Cycles and Contributions with PMTLab17 min Locked
  8. Capstone: Marina P&L, Break-Even Occupancy and a Rate-Increase ScenarioLab18 min Locked