Bottleneck and Effective Capacity per Day and Week
This lesson is part of the course
In this lesson
You turn machines, cycle times, OEE and shift patterns into effective capacity per hour and per week, find the true bottleneck and size the extra hours it needs.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- OEE by Shift: Availability, Performance and Quality Locked
- The Six Big Losses: Where the OEE Minutes Go Locked
- Takt Time, Cycle Time and Line Balancing Locked
- Bottleneck and Effective Capacity per Day and Week Locked
- MTBF, MTTR and Availability from a Breakdown Log Locked
- SMED Changeover Reduction and Economic Batch Size Locked
- Scrap and Rework Cost, First-Pass Yield and Rolled Throughput Yield Locked
- Capacity Plan vs Demand Forecast: Overtime or a Second Shift? Locked