Takt Time, Cycle Time and Line Balancing
This lesson is part of the course
In this lesson
You work out the pace the customer demands, add up the work at each station, find the line's real cycle time and measure how well the line is balanced.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- OEE by Shift: Availability, Performance and Quality Locked
- The Six Big Losses: Where the OEE Minutes Go Locked
- Takt Time, Cycle Time and Line Balancing Locked
- Bottleneck and Effective Capacity per Day and Week Locked
- MTBF, MTTR and Availability from a Breakdown Log Locked
- SMED Changeover Reduction and Economic Batch Size Locked
- Scrap and Rework Cost, First-Pass Yield and Rolled Throughput Yield Locked
- Capacity Plan vs Demand Forecast: Overtime or a Second Shift? Locked