Tutorvo

SMED Changeover Reduction and Economic Batch Size

Lesson 6 of 815 minLab

This lesson is part of the course

In this lesson

You split a mould change into internal and external work, measure how much press time SMED frees up and see how a cheaper changeover shrinks the economic batch size and its cost.

Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.

Lessons in this course

  1. OEE by Shift: Availability, Performance and QualityLab15 min Locked
  2. The Six Big Losses: Where the OEE Minutes GoLab15 min Locked
  3. Takt Time, Cycle Time and Line BalancingLab16 min Locked
  4. Bottleneck and Effective Capacity per Day and WeekLab15 min Locked
  5. MTBF, MTTR and Availability from a Breakdown LogLab14 min Locked
  6. SMED Changeover Reduction and Economic Batch SizeLab15 min Locked
  7. Scrap and Rework Cost, First-Pass Yield and Rolled Throughput YieldLab14 min Locked
  8. Capacity Plan vs Demand Forecast: Overtime or a Second Shift?Lab16 min Locked