SMED Changeover Reduction and Economic Batch Size
This lesson is part of the course
In this lesson
You split a mould change into internal and external work, measure how much press time SMED frees up and see how a cheaper changeover shrinks the economic batch size and its cost.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- OEE by Shift: Availability, Performance and Quality Locked
- The Six Big Losses: Where the OEE Minutes Go Locked
- Takt Time, Cycle Time and Line Balancing Locked
- Bottleneck and Effective Capacity per Day and Week Locked
- MTBF, MTTR and Availability from a Breakdown Log Locked
- SMED Changeover Reduction and Economic Batch Size Locked
- Scrap and Rework Cost, First-Pass Yield and Rolled Throughput Yield Locked
- Capacity Plan vs Demand Forecast: Overtime or a Second Shift? Locked