Campaign Cash Flow: Pledge Cash vs Construction Draws & the Bridge Financing Need
This lesson is part of the course
In this lesson
You lay the expected pledge cash next to the contractor's draw schedule, build the running balance, find its lowest point and the bridge financing the foundation must arrange, and chart cash in vs draws.
Buy the course once for $9.99 to unlock every lesson and lab, the final exam and the certificate – lifetime access, no subscription.
Lessons in this course
- The Gift Range Chart: Lead Gift, Gift Levels & Cumulative Share of the Goal Locked
- Prospects Needed: Prospect-to-Gift Ratios, Gaps per Level & the Hidden Shortfall Locked
- Rating Prospects: Capacity × Inclination, Suggested Asks & Ask Levels Locked
- Campaign Phases: Quiet-Phase Target, % of Goal vs % of Time & the Pace Index Locked
- Pledge Schedules: Annual Instalments, Due Dates with EDATE & Cash Expected per Year Locked
- Pledge Fulfilment: Overdue Amounts, Collection Rate & a Write-Off Allowance Locked
- Campaign Cash Flow: Pledge Cash vs Construction Draws & the Bridge Financing Need Locked
- The Campaign Dashboard: % of Goal, Cost per 1 Raised, Gifts by Level & the Thermometer Locked